第一阶段设计启动
在设计进行初期,安排设计团队主要成员与贵司经营管理团队、建筑师代表、项目主要领导的咨询会议。以确定各区域的各项设计要求,明确设计目标;并使各工作团队加强接触增进了解。
In the initial stage of interior design, our company arranges a consultation meeting between your executive management team (including the architect representative and the project leader) and the main members from our design team to determine the design requirements and aims of each area. Besides, we use this opportunity to strengthen our contact and enhance mutual understanding.
-
第二阶段概念设计
根据前期了解的资料,对综合性项目进行可行性分析,在总体规划方面,提出交通动线的畅通性, 设计会客观理性的加以剖析,并提出合理优化方案。结合经营的要求,提出动线和区块划分的平面图,并同经营管理团队进行先期沟通,以便更准确有效地进行后续工作。提报后设计将根据明确后的调整意见,对概念方向加以修正并以正式文本方式向贵司提出,作为后续工作的设计依据。
Based on the information collected in the early stage, our team analyzes the feasibility of this comprehensive project. We put forward the efficiency of moving lines and provide a reasonable optimized scheme by objective and rational analysis. We draft the plan of moving lines and area dividing according to the hotel management requirement. To ensure proper follow up, we will discuss with your executive management team in this phase. Referring to the decided adjustment, we will modify the design conception and direction and provide a formal text as the design basis for your company.
-
第三阶段方案设计
方案设计是建立在概念设计的基础上,对酒店设计及技术上的深化。达到相关部门对图纸的报批深度要求。方案设计是概念设计中的方向定位。落实到方案设计中每一个细节。确定规划指标、空间形态空间视觉的氛围。同时地关系到整个酒店设计运营最终的成败
Conceptual design is based on the design conception and proceeds with the interior design technically to meet the requirements of the authorized examining and approving organ. In this phase our team designs every detail of the project according to the design orientation and position decided in the conception stage. We determine the planning index, space form and visual atmosphere that concern the success of the hotel operation.
-
第四阶段扩初设计
这个阶段是方案和实施设计的衔接阶段,在完成方案设计及修改之后,将工作推进到施工图纸的制作。因为本项目还涉及到多个设计单位协作,将设计意图用图面形式表达出来,以便各协作设计单位如机电设备、指示系统、空调暖通、消防、幕墙、景观等后续深化设计团队能更容易的衔接。如果商业经营的团队结合招商需求,可能会对设计要求有所变化,也请在此阶段尽量提出,积极的配合设计调整。
This phase connects the conceptual design phase with the implementation phase. After the conceptual design and modifications, we push forward the work on drawing. Considering the cooperation with other design units, we express our design ideas through construction drawings, to provide convenience for the detailed design teams such as electromechanical device, indication system, heating ventilation, fire control, curtain wall and landscape architecture. If your commercial operating team has special investment demands, please put forward your advice in this phase and cooperate with us to modify the design scheme.
-
第五阶段施工图设计
第五阶段设计成果确认后,将准备有关施工的设计文件,列明各项装饰需求,并将与工程单位及贵司项目团队协调,以达成项目工程的顺利开展。图纸内容将明确表达设计部位的形式与材料工法。
After confirming the result of Phase Ⅳ, we prepare the documents for relevant construction, list the requirements of each decoration item, and coordinate with the engineering unit and your project team, to ensure a smooth execution of the project. The content of the drawings will explain the pattern and materiel for each design detail.
-
第六阶段设计服务
在整个工程开工后,酒店设计单位将在各工程关键节点时委派有丰富现场经验的项目组成员到达现场,进行重点监造服务,服务内容包含了材料及工法的确认,现场设计的调整与协调,以及配合贵司进行开业前设计验收工作。
After the project construction work starts, our hotel design team will assign experienced members to supervision service at the construction site in every crucial stage of the project. The service includes the confirmation of materials and technics, the design adjustment for the real situation, and the cooperation with your company in the completion inspection before the hotel opening.